Investments
AND GROWTH


In 2008, CTEEP brought nine new works into operation on the Basic Grid, along with 21 Other Transmission Installations, adding greater reliability and efficiency to the Brazilian interconnected system.
In order to consolidate its position as a major player in the Brazilian electricity sector, CTEEP invested R$ 327.2 million in 2008 in projects for increasing transformer capacity, construction, upgrading transmission lines, and other reinforcements.
million R$ | 2008 |
---|---|
Corporate | 14.7 |
Type I reinforcement | 175.1 |
Type II reinforcement | 18.2 |
New connections | 21.1 |
Transmission Modernization Plan | 23.8 |
Systemic Interest Facilities Modernization Plan | 18.1 |
Labor force capitalization | 5.9 |
Funds to subsidiaries | 50.3 |
Total | 327.2 |
In 2008, 42 projects were energized, along with the installation of 36 km of new transmission lines, 11.3 km of upgraded lines and 1,040 MVA of installed capacity. The highlights were:
- Through the subsidiary IEMG (Interligação Elétrica de Minas Gerais), CTEEP brought the Neves I – Mesquita 500 kV transmission line and the 91 MVAr reactor at the Neves I substation into operation. With a length of 172 km, the line connects the Neves I and Mesquita substations, passing through 14 municipalities. In addition to increasing the efficiency of the transmission system in eastern Minas Gerais, this is a strategic project for supplying energy to the state’s steelmaking region.
- Expansion of installed capacity at five boundary substations on the Basic Grid (Bauru, Capivara, Santa Cabeça, Ribeirão Preto and Sumaré), with investments of R$ 80 million and a 810 MVA increase to the company’s installed capacity.
- Conclusion of major works to improve the reliability of the 138 kV system in the extreme west of the state of São Paulo, bringing the Ilha Solteira – Jupiá, Três Irmãos –Ilha Solteira and Três Irmãos – Andradina transmission lines into operation and expanding the transmission capacity of the Três Irmãos substation.
- Expansion of the system that supplies the region of São Sebastião, on the coast of São Paulo state, with the installation of a new three-phase transformer (138-34.5 kV) in the São Sebastião substation and an expansion from 25 to 40 MVA of installed capacity for supply to the island of Ilha Bela, with investments of R$ 4 million.
- Installation of 15 kV equipment in the Vicente de Carvalho, Peruíbe, Mongaguá and Bertioga substations, to meet the increased demand for electricity on the coast of São Paulo state, with an investment of R$ 1.5 million.
- Expansion and modernization of the 230 kV system which supplies the Vale do Paraíba region, with the addition of 500 MVA in the nominal capacity of each of the six stretches of transmission line that supply this industrial region in the state of São Paulo. The investments totaled R$ 90 million and will be concluded by May 2009.
MVA added in 2008 | ||
---|---|---|
Substation | Voltages (kV) | Transformer Capacity Added(MVA) |
Ribeirão Preto | 440-138kV | 300 |
Sumaré | 440-138kV | 300 |
Santa Cabeça | 230-88kV | 60 |
Capivara | 440-138kV | 150 |
Bauru | 440-138kV | 150 |
Presidente Prudente | 138-88kV | 40 |
São Sebastião | 138-34,5kV | 40 |
Total | 1040 |
Of the resolutions authorized by ANEEL and the projects acquired at auctions, CTEEP brought nine new works into operation on the Basic Grid, along with 21 Other Transmission Installations (OTI), adding greater reliability and efficiency to the Brazilian interconnected system. These projects represent R$ 34 million in Permitted Annual Revenue.
Basic Grid | ||
---|---|---|
Location | Commercial Operation | PAR (thousand R$) |
Itapeti – Mogi – Mogi (F) 230 kV Transmission Line | Aug. 10, 2008 | 218 |
Bauru Substation | Oct. 21, 2008 | 1,394 |
Capivara Substation | Mar. 25, 2008 | 4,377 |
Santa Cabeça Substation | Mar. 31, 2008 | 1,778 |
Ribeirão Preto Substation | Mar. 25, 2008 | 4,772 |
Sumaré Substation | Mar. 17, 2008 | 5,273 |
Neves I Substation | Dec. 19, 2008 | 1,280 |
Mesquita Substation | Dec. 19, 2008 | 410 |
Mesquita-Neves Transmission Line | Dec. 19, 2008 | 5,095 |
Basic Grid Subtotal | 24,597 |
Other Transmission Installations – OTI | ||
---|---|---|
Location | Commercial Operation | PAR (thousand R$) |
São Sebastião Substation | Dec. 2, 2008 | 722 |
Ilha Solteira – Jupiá 138 kV Transmission Line | Mar. 15, 2008 | 54 |
Três Irmãos – Ilha Solteira 138 kV Transmission Line | Apr. 13, 2008 | 34 |
Três Irmãos – Andradina 138 kV Transmission Line | Nov. 16, 2008 | 1,671 |
Três Irmãos Substation | Jan. 9, 2008 | 731 |
Assis – P. Prudente 88 kV Transmission Line | Jan. 27, 2008 | 60 |
Milton Fornasaro Substation | July 30, 2008 | 1,704 |
Oeste Substation | May 14, 2008 | 715 |
Milton Fornasaro-Remédios 138 kV Transmission Line | June 30, 2008 | 1,704 |
Sumaré Substation | Sep. 3, 2008 | 357 |
Santa Bárbara d'Oeste Substation | May 28, 2008 | 149 |
Mogi Mirim II Substation | May 28, 2008 | 149 |
Flórida Paulista Substation | July 1, 2008 | 31 |
Peruíbe Substation | July 10, 2008 | 51 |
Três Irmãos Substation | July 19, 2008 | 51 |
Bertioga II Substation | July 31, 2008 | 51 |
Vicente de Carvalho Substation | June 26, 2008 | 51 |
Mongaguá Substation | July 15, 2008 | 51 |
Bom Jardim Substation | Apr. 3, 2008 | 715 |
Araraquara Substation | June 30, 2008 | 357 |
Promissão – Catanduva 138 kV Transmission Line | June 30, 2008 | 225 |
OTI Subtotal | 9,633 | |
Total OTI + Basic Grid | 34,231 |