Investments

AND GROWTH

In 2008, CTEEP brought nine new works into operation on the Basic Grid, along with 21 Other Transmission Installations, adding greater reliability and efficiency to the Brazilian interconnected system.

In order to consolidate its position as a major player in the Brazilian electricity sector, CTEEP invested R$ 327.2 million in 2008 in projects for increasing transformer capacity, construction, upgrading transmission lines, and other reinforcements.

million R$ 2008
Corporate  14.7
Type I reinforcement 175.1
Type II reinforcement 18.2
New connections 21.1
Transmission Modernization Plan 23.8
Systemic Interest Facilities Modernization Plan 18.1
Labor force capitalization 5.9
Funds to subsidiaries 50.3
Total 327.2

In 2008, 42 projects were energized, along with the installation of 36 km of new transmission lines, 11.3 km of upgraded lines and 1,040 MVA of installed capacity. The highlights were:

  • Through the subsidiary IEMG (Interligação Elétrica de Minas Gerais), CTEEP brought the Neves I – Mesquita 500 kV transmission line and the 91 MVAr reactor at the Neves I substation into operation. With a length of 172 km, the line connects the Neves I and Mesquita substations, passing through 14 municipalities. In addition to increasing the efficiency of the transmission system in eastern Minas Gerais, this is a strategic project for supplying energy to the state’s steelmaking region.
  • Expansion of installed capacity at five boundary substations on the Basic Grid (Bauru, Capivara, Santa Cabeça, Ribeirão Preto and Sumaré), with investments of R$ 80 million and a 810 MVA increase to the company’s installed capacity.
  • Conclusion of major works to improve the reliability of the 138 kV system in the extreme west of the state of São Paulo, bringing the Ilha Solteira – Jupiá, Três Irmãos –Ilha Solteira and Três Irmãos – Andradina transmission lines into operation and expanding the transmission capacity of the Três Irmãos substation.
  • Expansion of the system that supplies the region of São Sebastião, on the coast of São Paulo state, with the installation of a new three-phase transformer (138-34.5 kV) in the São Sebastião substation and an expansion from 25 to 40 MVA of installed capacity for supply to the island of Ilha Bela, with investments of R$ 4 million.
  • Installation of 15 kV equipment in the Vicente de Carvalho, Peruíbe, Mongaguá and Bertioga substations, to meet the increased demand for electricity on the coast of São Paulo state, with an investment of R$ 1.5 million.
  • Expansion and modernization of the 230 kV system which supplies the Vale do Paraíba region, with the addition of 500 MVA in the nominal capacity of each of the six stretches of transmission line that supply this industrial region in the state of São Paulo. The investments totaled R$ 90 million and will be concluded by May 2009.

MVA added in 2008    
Substation Voltages (kV) Transformer Capacity Added(MVA)
Ribeirão Preto 440-138kV 300
Sumaré 440-138kV 300
Santa Cabeça 230-88kV 60
Capivara 440-138kV 150
Bauru 440-138kV 150
Presidente Prudente 138-88kV 40
São Sebastião 138-34,5kV 40
Total   1040

Of the resolutions authorized by ANEEL and the projects acquired at auctions, CTEEP brought nine new works into operation on the Basic Grid, along with 21 Other Transmission Installations (OTI), adding greater reliability and efficiency to the Brazilian interconnected system. These projects represent R$ 34 million in Permitted Annual Revenue.

Basic Grid    
Location Commercial Operation PAR (thousand R$)
Itapeti – Mogi – Mogi (F) 230 kV Transmission Line Aug. 10, 2008 218
Bauru Substation Oct. 21, 2008 1,394
Capivara Substation Mar. 25, 2008 4,377
Santa Cabeça Substation Mar. 31, 2008 1,778
Ribeirão Preto Substation Mar. 25, 2008 4,772
Sumaré Substation Mar. 17, 2008 5,273
Neves I Substation Dec. 19, 2008 1,280
Mesquita Substation Dec. 19, 2008 410
Mesquita-Neves Transmission Line Dec. 19, 2008 5,095
Basic Grid Subtotal   24,597


Other Transmission Installations – OTI    
Location Commercial Operation PAR (thousand R$)
São Sebastião Substation Dec. 2, 2008 722
Ilha Solteira – Jupiá 138 kV Transmission Line Mar. 15, 2008 54
Três Irmãos – Ilha Solteira 138 kV Transmission Line Apr. 13, 2008 34
Três Irmãos – Andradina 138 kV Transmission Line Nov. 16, 2008 1,671
Três Irmãos Substation Jan. 9, 2008 731
Assis – P. Prudente 88 kV Transmission Line Jan. 27, 2008 60
Milton Fornasaro Substation July 30, 2008 1,704
Oeste Substation May 14, 2008 715
Milton Fornasaro-Remédios 138 kV Transmission Line June 30, 2008 1,704
Sumaré Substation Sep. 3, 2008 357
Santa Bárbara d'Oeste Substation May 28, 2008 149
Mogi Mirim II Substation May 28, 2008 149
Flórida Paulista Substation July 1, 2008 31
Peruíbe Substation July 10, 2008 51
Três Irmãos Substation July 19, 2008 51
Bertioga II Substation July 31, 2008 51
Vicente de Carvalho Substation June 26, 2008 51
Mongaguá Substation July 15, 2008 51
Bom Jardim Substation Apr. 3, 2008 715
Araraquara Substation June 30, 2008 357
Promissão – Catanduva 138 kV Transmission Line June 30, 2008 225
OTI Subtotal 9,633